Project:
LG Power generation System |
End User:
Leoro Gold (Ghana) |
Description of work:
Remote power station Automation system with 6 generators. Each generator is capable of operating independently or via a central power management system. The central system comprised a Quantum hot standby configuration. |
|
Project:
Vessel Motion Control System |
Client:
Halcyon |
Description of work:
We developed in conjunction with halcyon a complete ships motion control system. The system measures the ships motions and through a series of advanced algorithms controls several control surfaces to counteract the motion of the ship to reduce sea sickness. |
|
Project:
Vessel Motion Control System Upgrade |
End User:
Euroferrys Pacifica http://www.euroferrys.com/ |
Description of work:
The project involved tailoring of the Halcyon motion control system to retrofit seamlessly to the vessels existing motion control system. |
|
Project:
Active Heave Compensated Winch |
End User:
Helix Well-Ops http://www.helixesg.com/wellops/index.html |
Description of work:
The project involved designing an intelligent control system to control the recovery and deployment of sub sea machinery. In most cases it is critical to keep the equipment stable while the surface deployment vessel is moved by the swell. The control system monitors these motions and compensates by releasing and retrieving the main winch to keep the load still. |
|
Project:
ACV Upgrade |
End User:
Australian Customs http://www.customs.gov.au/ |
Description of work:
The project retrofitting the entire fleet of Bay class vessels by tailoring of the Halcyon motion control system to retrofit seamlessly to the vessels existing motion control systems. The project also includes substituting existing legacy analogue positioning systems with high speed digital closed loop control. |
|
Project:
Cold Roling Line |
End User:
Tyco Water http://www.tycowater.com/ |
Description of work:
The project involved design, supply, manufacture, installation and commissioning control and safety systems for a new cold rolling line at Tyco’s pipe manufacturing facility in Kwinana. |
|
Project:
Control System Upgrade |
End User:
Kirin Australia http://www.kirinaustralia.com.au/ |
Description of work:
Retrofitted the entire process control system with the latest Unity hot standby and Citect SCADA technology. 3 new processes were also added and existing mobile machinery integrated into the SCADA system via industrial wireless Ethernet. |
|
Project:
Ships Motion Control System |
End User:
Swedish Navy http://www.naval-technology.com/projects/visby/ |
Description of work:
Design, supply and manufacture of complete ship motion control systems for the Swedish Navy fleet of Visby Class Corvette’s. |
|
Project:
Ships Control System |
End User:
Hanseatic Marine http://www.hanseaticmarine.eu |
Description of work:
Utilising Elecmec’s own iShip, Ships control system. All ship board systems were integrated into the one user friendly system allowing the end user total control and monitoring at their finger tips. |